Escondido-Pasture #1
FIELD REPORT Today Job To-Date
Today's Date: 10-9-2007 NA
Project Start Date: NA 10-2-2007
Treatment: Spraying
Units: Standard
Tractor Number: 2235 NA
Implement Number: 001 NA
Implement Width (ft): 16 NA
Operator's Initials: EJR NA
Start Time: 8:05:23 AM NA
End Time: 12:23:46 PM NA
Total Hours Worked: 4.30 72.36
Hours Stopped: 0.2132 1.3354
Percent Time Stopped: 4.8822 1.8457
Tractor Malfunction (%) 15.23 11.24
Implement Malfunction (%) 0 2.22
Tractor Maintenance(%) 10.60 9.41
Implement Maintenance(%) 1.87 1.93
Computer/GPS Malfunction(%) 0 0
Refueling (%) 22.34 24.98
Field Meeting (%) 11.05 10.54
Break (%) 32.01 34.22
Unspecified (%) 6.90 5.46
Non-Treating:
Hours Moving: 1.2343 20.6031
Percent Time Moving: 28.6065 28.4725
Miles Traveled: 9.8439 161.7148
Traveling Speed (mph): 8.0014 7.8522
Treating:
Hours Moving: 2.8664 50.4326
Percent Time Moving: 66.5121 69.6985
Miles Traveled: 17.733 300.066
Traveling Speed (mph): 6.203 5.955
Total Acres Treated: 21.4933 363.7123
Average Acres per Hour: 5.002 5.035
Pre-Treatment Notes:
Hour Meter: 1232.4 Tractor was low on hydraulic fluid Window was left open by previous operator
Post-Treatment Notes:
Hour Meter: 1236.7 All fittings were greased Fueled-up Hydraulic Fluid topped-off